Monday, July 21, 2008

Govt allocates $450 Mn for Bangalore's upgrade

Bangalore's infrastructure development in this fiscal's state budget, tabled by chief minister B.S. Yeddyurappa here Thursday.Yeddyurappa, who also holds the finance portfolio, said Bangalore would require a whopping Rs.360 billion to tackle its infrastructure problems over the next five years.

"Such a huge investment can be made possible through the state government, public-private partnership and support from the 6.5-million citizens of Bangalore," Yeddyrappa said.Of the Rs.18 billion, Rs.7 billion will be allotted to the Bangalore metro project, Rs.3 billion to the municipal corporation, Rs.2.4 billion for improvement of roads, Rs.1 billion for drinking water supply to the extended areas through bore wells, and Rs.250 million for improvement of traffic management."We will also develop a 65-kilometre outer ring road at a cost of Rs.30 billion under a build, own and transfer (BOT) basis. For smooth traffic flow in the gridlocked roads, 10 flyovers and under-passes will be built at Rs.3.5 billion," Yeddyurappa said. To ease the traffic congestion and provide adequate parking space, about 40 multi-storeyed parking facilities will be constructed on a public-private partnership (PPP) basis.

The Bangalore Development Authority (BDA) will invest Rs.7 billion to provide roads, drainage and drinking water facilities in the extended civic areas, he said.

"BDA will also form three new layouts to allot housing sites for citizens on priority," the chief minister said.Of the three proposed layouts, the Nada Prabu Kemegowda layout will be formed to provide about 60,000 sites, with 20 percent of them reserved for low-income groups.As part of infrastructure development, the state government has appointed the Delhi Metro Rail Corporation (DMRC) as adviser to implement the 40-kilometre high-speed rail link project - connecting the city and the newly opened international airport at Devanahallion - on a PPP basis."Though 34 percent of the state's population lives in urban areas, accounting for about 80 percent of economic activities, the civic infrastructure has not kept pace with the phenomenal increase in the population and the level of economic growth," Yeddyurappa said.

To develop urban areas across the state, the plan outlay for the sector has been increased to Rs.50.41 billion this fiscal from Rs.29.23 billion last year.
This was the Bharatiya Janata Party government's maiden budget.

http://www.siliconindia.com/shownews/43988/1

Tuesday, July 15, 2008

ITIL Essentials Study Guide Introduction

Service Support Functions:

• Service Desk
• Incident Management
• Problem Management
• Change Management
• Configuration Management
• Release Management

Service Delivery Functions:

• Availability Management
• IT Services Continuity Management
• Capacity Management
• Financial Management
• Service Level Management

Configuration Management

Objectives:

• Providing information on the IT infrastructure
o To all other processes
o IT Management

• Enabling control of the infrastructure by monitoring and maintaining information on:
o All the resources needed to deliver services
o Configuration Item (CI) status and history
o Configuration Item relationships

Tasks:

• Identification and naming
• Management information
• Verification
• Control
• Status Accounting

Asset: Component of a business process like people, accommodation, computer systems, paper records, fax machines, etc.

Configuration Management Database: A database, which contains all relevant details of each Configuration Item (CI) and details of the important relationships between CIs. A Configuration Item (CI):
• Is needed to deliver a service
• Is uniquely identifiable
• Is subject to change
• Can be managed

A Configuration Item (CI) has:
• a Category
• Relationships
• Attributes
• a Status

Variant: A Configuration Item (CI) that has the same basic functionality as another Configuration Item (CI) but is different in some small way (ex: has more memory) Baseline: A snapshot of the state of a Configuration Item and any component or related Configuration Items, frozen in time for a particular purpose (such as the ability to return a service to a trusted state if a change goes wrong)

Configuration Management supports all other processes!
Scope vs. Detail
Relationships – Common Types:
• Is a component of
• Is a copy of
• Relates to
• Relates with
• Is used by

Service Desk

Objectives:
• To be the primary point of call for all:
o Calls
o Questions
o Requests
o Complaints
o Remarks

• To restore the service as quickly as possible
• To manage the incident life-cycle (coordinating resolution)
• To support business activities
• To generate reports, to communicate and to promote
Different Desks
• Call Center: Handling large call volumes of telephone-based transactions.
• Help Desk: To manage, coordinate, and resolve Incidents as quickly as possible.
• Service Desk: Allowing business processes to be integrated into the Service Management infrastructure. It not only handles Incidents, Problems and questions, but also provides an interface for other activities.

Service Desk Essentials:
• Single point of contact / Restore service ASAP
• Tasks: Customer Interface, Business Support, Incident Control & Management Information
• Concentrates on incident lifecycle management
• Incident: Unexpected disruption to agreed service
• Priority determined by business impact and urgency
• Correct assessment of priorities enables the deployment of manpower and other resources to be in the best interests of the customer
• Escalation and referral

Incident Management

Objectives:
• To restore normal service as quickly as possible
• Minimize the adverse impact on business operations
• Ensuring that the best possible levels of service quality and availability are maintained according to SLAs.

Incident: Any event which is not part of the standard operation of a service and which causes or may cause an interruption to or a reduction in the quality of that service.

Work-Around: Method of avoiding an Incident or Problem.
Service Request: Every Incident not being a failure in the IT Infrastructure.
Problem: The unknown root cause of one or more incidents.
Known Error: A condition that exists after the successful diagnosis of the root cause of a problem when it is confirmed that a CI (Configuration Item) is at fault.

Impact on the business + Urgency / Effect upon business deadlines = Priority
Category: Classification of a group of Incidents (Application, Hardware, etc.)

Escalation (Vertical Escalation): escalates up the management chain.

Referral (Horizontal Escalation): escalates to a different knowledge group. Routing.

Incident Life-Cycle
• Accept Service Event, Register and Consult the CMDB
• Classification
• Solve
• Closure

Reporting is VERY important.
• Daily reviews of individual Incident and Problem status against service levels
• Weekly management reviews
• Monthly management reviews
• Proactive service reports

Problem Management

Objectives:
• Stabilizing IT services through:
o Minimizing the consequences of incidents
o Removal of the root causes of incidents
o Prevention of incidents and problems
o Prevent recurrence of Incidents related to errors
• Improving productive use of resources

Tasks:
• Problem Control
• Error Control (including raising RfCs – Request for Change)
• Proactive Prevention
• Identifying Trends
• Management Information
• Posit Implementation Review (PIR)
Goal is to get from reactive or proactive. Stop problems from occurring / recurring.

Inputs:
• Incident details
• Configuration details
• Defined work-arounds

Outputs:
• Known Errors
• Requests for Change
• Updated Problem Records including work-arounds and/or solutions
• Response to Incident Management from Matching Management Information

Problem Control
• Identification
• Classification
• Assign Resources
• Investigation and Diagnosis
• Establish Known Error

Error Control
• Error Identification and Recording
• Error Assessment
• Recording Error / Resolution (Send out RfC)
• Error Closure
Known Error: An Incident or Problem for which the root cause is known and for which a temporary Work-around or a permanent alternative has been identified.

Proactive Problem Management:
• Trend Analysis
• Targeting Support Action
• Providing Information to the Organization
Known Errors resulting from Development should be made known to the Helpdesk. Reporting is also key for Problem Management.

Change Management

Objective: To implement approved changes efficiently, cost-effectively and with minimal risk to the existing and to the new IT infrastructure. Only approved changes made, risk and cost minimized.

Change Management Tasks:
• Filtering Changes
• Managing Change Process
• Managing Changes
• Chairing CAB and CAB/EC
• Review and Closure
• Management Information

Inputs:
• Requests for Change (RfC)
• CMDB
• Forward Schedule of Changes (FSC)

Outputs:
• Forward Schedule of Changes (FSC)
• Requests for Change (RFC)
• CAB minutes and actions
• Change management reports

Impact of change:
• Category 1
o Little impact on current services. The Change Manager is entitled to authorize this RfC.
• Category 2
o Clear impact on services. The RfC must be discussed in the Change
Advisory Board. The Change Manager requests advice on authorization and planning.
• Category 3
o Significant impact on the services and the business. Considerable manpower and/or resources needed. The RfC will have to be submitted to the board level (CAB/EC – Change Advisory Board / Executive Committee)

Priority Setting:
• Urgent
o Change necessary now (otherwise severe business impact)

• High
o Change needed as soon as possible (potentially damaging)

• Medium
o Change will solve irritating errors or missing functionality (can be
scheduled)

• Low
o Change leads to minor improvements

A change backout plan must always be possible.Change management always ends with a review of the change.

Change: The addition, modification, or removal of approved, supported or baselined hardware, network, software, application, environment, system, desktop build or associated documentation.

Request for Change: Form or screen, used to record details of a request for a change to any CI within an infrastructure or to procedures and items associated with the infrastructure.

Forward Schedule of Changes (FSC): Schedule that contains details of all the Changes approved for implementation and their proposed implementation dates.

Change Management Process
1. Request for a Change
2. Registration and Classification
3. Monitoring and Planning
4. Approve
5. Build & Test
6. Authorize Implementation
7. Implementation
8. Evaluate

Release Management

Objectives:
• Safeguard all software and related items
• Ensure that only tested / correct version of authorized software are in use
• Ensure that only tested / correct version of authorized hardware are in use
• Right software, right time, right place
• Right hardware, right time, right place

Tasks:
• Define the release policies
• Control of the Definitive Software Library (DSL)
• Control of the Definitive Hardware Storage (DHS)
• Distribute Software and Associated CIs
• Carry out S/W audits (using CMDB)
• Manage the software releases
• Oversee build of the software releases

Releases are done under the control of Change Management.
DSL : Definitive Software Library. Reliable versions of software in a single logical location. However, software may be physically stored at different locations.

Release Policy:
• Release Unit
• Full / Package / Delta Releases
• Numbering
• Frequency
• Emergency Change
Version Control:
• Development
• Testing
• Live
• Archive
Process:
• Software Control and Distribution (operational)
• Change Management (control)
• Configuration Management (control and administration)
Only process which creates its own policy.

Availability Management

Objectives:
• To predict, plan for and manage the availability of services by ensuring that:
o All services are underpinned by sufficient, reliable and properly
maintained CIs
o Where CIs are not supported internally there are appropriate contractual agreements with third party suppliers
o Changes are proposed to prevent future loss of service availability
• Only then can IT organizations be certain of delivering the levels of availability agreed with customers in SLAs.
Aspects of Availability:
• Reliability
• Maintainability: Maintenance you do yourself, as a company
• Resilience: Redundancy
• Serviceability: Maintenance done by someone else
Availability Information is stored in an Availability Database (ADB). This information is used to create the Availability Plan. SLAs provide an input to this process.

Unavailability Lifecycle

MTTR: Mean Time to Repair (Downtime) – Time period that elapses between the detection of an Incident and it’s Restoration. Includes: Incident, Detection, Diagnosis, Repair, Recovery, Restoration.

MTBF: Mean Time Between Failures (Uptime) – Time period that elapses between Restoration and a new Incident.

MTBSI: Mean Time Between System Incidents – Time period that elapses between two incidents. MTTR + MTBF.

“An IT service is not available to a customer if the functions that customer requires atthat particular location cannot be used although the agreed conditions under which the IT service is supplied are being met”

Simplistic Availability Calculation:
Agreed Service Hours – Downtime 100
------------------------------------------ X ----
Agreed Service Hours 1
IT Service Continuity Management
Why plan?
• Increases Business dependency on IT
• Reduced cost and time of recovery
• Cost to customer relationship
• Survival
Many businesses fail within a year of suffering a major IT disaster.

Business Impact Analysis:
Risk Analysis:
• Value of Assets
• Threats
• Vulnerabilities
Risk Management:
• Countermeasures
• Planning for potential disasters
• Managing a disaster
Risk Analysis: Based on the CCTA Computer Risk Analysis and Management Methodology (CRAMM)
Options:
1. Do nothing
2. Manual workarounds
3. Reciprocal arrangements
4. Gradual Recovery (cold standby)
5. Intermediate Recovery (warm standby)
6. Immediate Recovery (hot standby)
Cold start = accommodation. Environmental controls; power and communications Hot start = cold start + computing equipment and software
7 Sections of the Plan:
1. Administration
2. The IT Infrastructure
3. IT Infrastructure management & Operating procedures
4. Personnel
5. Security
6. Contingency site
7. Return to normal
Test and Review:
• Initially then every 6 to 12 months and after each disaster
• Test it under realistic circumstances
• Move / protect any live services first
• Review and change the plan
• All changes made via the CAB – Change Advisory Board
Contingency Plan:
• Assists in fast, controlled recovery
• Must be given wide but controlled access
• Contents (incl. Admin, Infrastructure, People, Return to normal)
• Options (incl. Cold & Hot Start)
• Must be tested regularly – without impacting the live service

Capacity Management

Objective:
To determine the right, cost justifiable, capacity of IT resources such that the Service Levels agreed with the business are achieved at the right time.

Objectives:
• Demand Management
o Business Capacity Management
• Workload Management
o Service Capacity Management
• Resource Management
o Resource Capacity Management

While doing the above, also need to do:
• Performance Management
o Internal and External Financial Data
o Usage Data
o SLM Data / Response Times
CDB – Capacity Data Base – Contains all Metrics, etc. Used to create a Capacity Management Plan. Performance Management Data populates the CDB.

Essentials:
• From Customer Demands to Resources
• Demand Management
• Workload Management
• Performance Management
• Capacity Planning
• Defining Thresholds and Monitoring
Application Sizing: To estimate the resource requirements to support a proposed application change to ensure that it meets its required service levels.

Modeling:
• Trend Analysis
• Analytical Modeling
• Simulation Modeling
• Baseline Models
• Used to Answer the “What If… “ questions
• Data for Modeling comes from the CDB

Financial Management

Objectives:
To provide information about and control over the costs of delivering IT services that support customers business needs. Costing is a must!
Input cost units recommended by ITIL:
• Equipment Cost Units (ECU)
• Organization Cost Units (OCU)
• Transfer Cost Units (TCU)
• Accommodation Cost Units (ACU)
• Software Cost Units (SCU)
Equipment = hardware
Organization = staff
Transfer = costs which IT incurs acting as an agent for the customer, they do not appear as a cost against the IT department’s budget

Accommodation = buildings
Software = software
Different Cost Types:
• Fixed - unaffected by the level of usage
• Variable - varying according to the level of usage
• Direct - usage specific to one service
• Indirect or Overhead – usage not specific to one service
• Capital – not diminished by usage
• Revenue or running – diminish with usage

Charging Objectives:
• Recover from customers the full costs of the IT services provided
• Ensure that customers are aware of the costs they impose on IT
• Ensure that providers have an incentive to deliver and agreed quality and quantity of economic and effective services

Charging and Pricing Options:
Charging:
• No Charging – IT treated as support center
• Notional Charging – IT treated as cost center
• Actual Charging
Pricing:
• Recover of Costs – IT treated as a service center
• Cost Price Plus – IT treated as a profit center
• Market Prices – IT treated as a profit center
Support and Cost centers used “soft charging” in which no money changes hands;

service and profit centers use “hard costing” in which money is transferred between bank accounts Profit centers focus on the value of the IT service to the customer Good Financial Management minimizes the risks in decision making

Main Processes:
Budgeting: The process of predicting and controlling the spending of money within the enterprise and consists of periodic negotiation cycle to set budgets (usually annual) and the day-to-day monitoring of the current budgets. Key influence on strategic and tactical plans.

IT Accounting: The set of processes that enable the IT organization to fully account for the way its money is spent (particularly the ability to identify costs by customer, by service, by activity).

Charging: The set of processes required to bill a customer for the services applied to them. To achieve this requires sound IT Accounting, to a level of detail determined by the requirements of the analysis, billing, and reporting procedures.


Service Level Management

Balance between the Demand for IT services and the Supply of IT services by knowing the requirements of the business and knowing the capabilities of IT.

Objectives:
• Business-like relationship between customer and supplier
• Improved specification and understanding of service requirements
• Greater flexibility and responsiveness in service provision
• Balance customer demands and cost of services provision
• Measurable service levels
• Quality improvement (continuous review)
• Objective conflict resolution

Tasks:
• Service Catalog
• Service Level Requirements
• Service Level Agreement
• Operational Level Agreements (OLA) and Contracts
• Service Specsheet
• Service Quality Plan
• Monitor, Review and Report
• Service Improvement Programs
• Customer Relationship Management

Minimum Requirements for an Agreement:
• Period
• Service Description
• Throughput
• Availability
• Response Times
• Signature

Other Possible Clauses:
• Contingency arrangements
• Review procedures
• Change procedures
• Support services
• Customer responsibilities
• Housekeeping
• Inputs and Outputs
• Changes

Ideally contracts are based on targets in the SLA SLAs must be monitored regularly and reviewed regularly

• Monitor to see if service is being delivered to specification
• Review to see if service specification is still appropriate

Saturday, July 12, 2008

Unified Communications Strategies

UC Strategies is an industry resource for enterprises, vendors, system integrators, and anyone interested in the growing Unified Communications arena. A supplier of objective information on Unified Communications, UC Strategies is supported by an alliance of leading communication industry Advisors, Analysts, and Consultants, who have worked in the various segments of Unified Communications since its inception.

Communication Enabled Business Process

The goal of Communication Enabled Business Process (CEBP) is to optimize business process by reducing the human latency that exists within a process flow. For example, a mortgage approval process may be experiencing human latency because the person assigned to providing an approval is on vacation or busy working on something else. To reduce this latency, CEBP leverages Unified communications capabilities (i.e. UC services) by embedding them into the business process flow. The result is a more efficient, more automated closed-loop process; translating into significant ROI.
If the person does not provide the necessary approval within a designated period of time then the business process would invoke a UC service such as “notify and respond” from an IP PBX, voice portal/IVR, conferencing application, etc. These embedded UC services would “notify” the person that they need to do something. If the person does not “respond” to the notification then it can be escalated to a manager in the same manner.
In fact, there are a number of UC services that could be embedded within a business process to reduce human latency. These could include: conference [on demand], alert, escalate, contact resident expert, etc.; all of which create measurable business value.
The great thing about CEBP is that it can be applied horizontally across different lines of business and different industries. Virtually every business process is hampered by human latency. Some other use cases that CEBP can be applied to include: roadside assistance, stock portfolio alerts, personal information loss, claims processing, inventory management, etc. Here is a more detailed example:

Alpine VIVA: Status Of Construction till 29th June 2008

Alpine VIVA: Status Of Construction till 29th June 2008